Ce qui sera construit
Tunnels are now just track burried under the terrain. We need tunnel entrances that cut a hole into the terrain to let the trains in. And the tunnels should also have their own walls and be dark inside.
Real tunnels with tunnel entrances and tunnel walls.
Tunnels are now just track burried under the terrain. We need tunnel entrances that cut a hole into the terrain to let the trains in. And the tunnels should also have their own walls and be dark inside.
Le devis complet, ligne par ligne, comme sur une facture. Rien n'est caché dans un chiffre rond.
| Ligne | Le calcul | Montant |
|---|---|---|
| Holes in terrain and tunnel wallsTravail | 16 heures × €75 | €1.200,00 |
| Tunnel entrancesTravail | 8 heures × €75 | €600,00 |
| 3D modellenMatériel | 5 × €20 | €100,00 |
| Hosting en onderhoudHébergement et maintenance | 2 % de €1.900 | €38,00 |
| L'objectif | €1.938,00 | |
Connectez-vous pour participer à cette discussion.
Connexion