Co zostaje zbudowane
Tunnels are now just track burried under the terrain. We need tunnel entrances that cut a hole into the terrain to let the trains in. And the tunnels should also have their own walls and be dark inside.
Real tunnels with tunnel entrances and tunnel walls.
Tunnels are now just track burried under the terrain. We need tunnel entrances that cut a hole into the terrain to let the trains in. And the tunnels should also have their own walls and be dark inside.
Cała wycena — wiersz za wierszem, jak na fakturze. Nic nie jest ukryte w zaokrąglonej liczbie.
| Linia | Jak się składa | Kwota |
|---|---|---|
| Holes in terrain and tunnel wallsPraca | 16 godzin × €75 | €1.200,00 |
| Tunnel entrancesPraca | 8 godzin × €75 | €600,00 |
| 3D modellenMateriały | 5 × €20 | €100,00 |
| Hosting en onderhoudHosting i konserwacja | 2% z €1.900 | €38,00 |
| Cel | €1.938,00 | |
Zaloguj się, aby wziąć udział w tej dyskusji.
Zaloguj się