What was asked for
Tunnels are now just track burried under the terrain. We need tunnel entrances that cut a hole into the terrain to let the trains in. And the tunnels should also have their own walls and be dark inside.
Real tunnels with tunnel entrances and tunnel walls.
Tunnels are now just track burried under the terrain. We need tunnel entrances that cut a hole into the terrain to let the trains in. And the tunnels should also have their own walls and be dark inside.
The whole quote, line by line, the way an invoice is written. Nothing is hidden in a round number.
| Line | How it adds up | Amount |
|---|---|---|
| Holes in terrain and tunnel wallsWork | 16 hours × €75 | €1,200.00 |
| Tunnel entrancesWork | 8 hours × €75 | €600.00 |
| The goal | €1,800.00 | |
Sign in to join this discussion.
Sign in